INFRASTRUCTURE PLANNING

Name of Project Name of client Year executed Description
Project Victor DGNP Vizag 2005-2006 DGNP wanted to establish a alternate Naval Base to Vizag to enable Navy decongest the Naval Part at Vizag. IDDC was assigned the task to assist Navy to identify the location, conceptualize the port and compile the master plan for the facilities and complete the Detailed project report including design of each and every structure planned in the port. IDDC completed the assignment in a record time of 8 months as the client wanted to speed track the project.
Infrastructure Audit and Planning for Master Plan GAMADA Through Master planner  Jurong Consultant of Singapore, 2002-2007 GAMADA authorizes compiled a master plan for the Capital of Punjab state at Mohali. Jurong of Singapore was assigned the task. Jurong chose IDDC to assist them in the infrastructure audit and design component of the Master plan. The task included field study of existing infrastructure and listing the existing facilities. To project the demand of the various component of infrastructure like road network, water sourcing, water supply network analysis and design   including WTP, waste water network analysis and design including STP, Electricity network analysis and design including locating various transmission hubs, Communication network analysis and design, piped gas network analysis and design , river training and flood control works, forest preservation, ground water conservation, etc.
Anjur Project Lodha Developer

2008

IDDC was assigned the task by Lodha developers for their Anjur project the infrastructure design for component of the Master plan. Task included to project the demand of the various component of infrastructure like road network, water sourcing, water supply network analysis and design   including WTP, waste water network analysis and design including STP, Electricity network analysis and design including locating various transmission hubs, Communication network analysis and design, piped gas network analysis and design , river training and flood control works, forest preservation, ground water conservation, etc
DPR for Storm Water Disposal System for Gajuwaka, West & Pendurthy Assemblies

Greater Visakhapatnam Municipal Corporation

2016

GVMC provided the requirement for the future forecast for the 15years based on the development layout. IDDC designed the storm water drainage for the layout for three assemblies of the project. Entire network analysis was done and based on the expected demand the various component s of the network were designed and detailed.
DPR for Investigation, Survey, preparation of Designs, Estimates, Drawings for Storm Water Drainage scheme in Tadepalligudem Municipality

Tadeapalligudem Municipality

2013

IDDC has reviewed survey for the entire area and prepared designs estimates and drawings for existing system.
Health study works of Civil & Structural for VSP - Sinter Plant 1 & 2 Project

Vizag Steel Plant

2015-2017

IDDC has done Health study for Civil & Structural for Visakhapatnam Steel Plant for Sinter Plant 1 & 2 Project.

Master planning is done considering the Vision plan, regional level master infrastructure plan, local authorities planning & development control regulations, sector development plans etc. Detail service layout with all the supporting calculations were done for the infrastructural services such as storm water drainage, sewage, water supply and distribution, transportation network, flood control, hydro-electric work, irrigation, river pollution, power supply and distribution, telecommunication, gas supply and distribution, solid waste management and land filling, non-conventional energy, ground water recharging, rainwater harvesting etc. The planning included the study of existing layout, listing the improvement areas, forecasting the future requirement of the land etc. based on the details designing the Master plan in detail. The time frame given for the Master planning can be for 25/50 years.